Project Description:
PEPPERELL- BRIDGE RECONSTRUCTION, P-06-004, GROTON STREET OVER THE NASHUA RIVER
This project entails the replacement of the existing Groton Street covered wooden bridge over the Nashua River. The three span replacement structure will be a timber truss covered center span with two traditional steel/concrete approach spans. There will be minor improvements made to the bridge roadway approaches. A temporary bridge will be erected to maintain pedestrian access and utility services during construction. Vehicular traffic will be detoured during construction.
Location:
  • Town of Pepperell
  • Resident Engineer: Frederick Stacy
    Construction Contract Value: $8,788,599.00
    Construction Bid Price: $7,967,272.00
    Initial Construction Estimate: $5,338,143.20
    District: District 3

    Contracts (3) Progress
    # 30274 -- Design -- Footprint Bridge contracts
    Statewide Footprint Bridge Round 1 Final
    # 52805 -- Construction Contract
    Pepperell - Bridge Replacement (P-06-004) (Steel Stringer - Timber Truss) Groton Street over the Nashua River Completed
    # 57730 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final

    Bridges

    Contract Dates
    Notice to Proceed: 11/30/2007
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 11/08/2000
    Project Review Committee PRC Approved 12/19/2000
    Project Status Advertised 09/16/2006
    Project Management
    100% Design 100% Package Received 11/15/2005
    100% Design 100% Package Comments to DE 03/10/2006
    25% Design 25% Package Received 09/13/2004
    25% Design 25% Package Comments to DE 11/19/2004
    75% Design 75% Package Received 06/14/2005
    75% Design 75% Package Comments to DE 07/29/2005
    Final Design PS&E Received 05/23/2006
    Final Design PS&E to FAPRO 09/01/2006