Project Description: |
WESTMINSTER- BRIDGE REPLACEMENT, W-28-021, ROUTE 2 (EB & WB) OVER WEST MAIN STREET (ROUTE 140)
The proposed project involves the replacement of the Route 2 Bridge over West Main Street (Route 140). The proposed work will involve the demolition of the existing bridges (eastbound and westbound). The minimum vertical clearance will be increased in order to achieve the standard clearance. Both bridges will remain open to traffic throughout construction.
|
Location: |
|
Resident Engineer: | Carmen Ramirez |
Construction Contract Value: | $13,671,253.00 |
Construction Bid Price: | $11,378,916.25 |
Initial Construction Estimate: | $14,065,277.00 |
District: | District 3 |
|
Bridges
|
|
|
|
|