FITCHBURG- LEOMINSTER- IMPROVEMENTS & SIGNALIZATION OF ROUTE 12 (PHASE I & II)
Phase 1 improvements will include minor pavement widening along the Route 12 corridor to provide two 11.50-foot travel lanes and 8-foot shoulders. Intersection improvements at the junction of Route 12 and Bemis Road will include widening Route 12, realigning and widening Bemis Road, and the installation of new traffic signals. Phase 2 improvements will include minor pavement widening along the Route 12 corridor to provide two 11.50-foot travel lanes and 8-foot shoulders, adding auxiliary lanes on Route 12 at the Erdman Way intersection and upgrading the existing traffic signal at the intersection of Route 12 with Erdman Way. The proposed scope of work for both sections will also include new sidewalks and granite curbing on both sides of the roadway.
|