Project Description:
KINGSTON- BRIDGE DECK REPLACEMENT, BR# K-01-013 ROUTE 3A OVER ROUTE 3
The work includes replacing the existing concrete bridge deck, steel stringer repairs, cleaning and painting the existing structural steel, installing new sidewalks, removing and replacing bridge railing, and removing and resetting bridge mounted guide signs. The work also includes reconstruction of approximately 400 feet of Route 3A.
Location:
  • Town of Kingston
  • Design Responsibility: Consultant
    Right of Way Responsibility: Other
    Project Manager: John Gendall
    Estimated Total Contract Cost: $1,334,145.27
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • K01013 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project