Project Description: |
KINGSTON- BRIDGE DECK REPLACEMENT, BR# K-01-013 ROUTE 3A OVER ROUTE 3
The work includes replacing the existing concrete bridge deck, steel stringer repairs, cleaning and painting the existing structural steel, installing new sidewalks, removing and replacing bridge railing, and removing and resetting bridge mounted guide signs. The work also includes reconstruction of approximately 400 feet of Route 3A.
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $1,334,145.27 |
Construction Bid Price: | $1,209,224.50 |
Initial Construction Estimate: | $865,000.00 |
District: | District 5 |
|
Bridges
|
|
|
|
|