Project Description: |
REVERE- LANDSCAPING ALONG SQUIRE ROAD (ROUTE 60) AND BROADWAY (ROUTE 107)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Tara Mitchell |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 01/27/2001 ) |
|
Bridges |
|
|
|