| Project Description: |
FREETOWN- BRIDGE PRESERVATION, BR# F-09-011, ROUTE 24 OVER ROUTE 79
The purpose of this project is to replace the bridge deck, while retaining the support beams and substructure. No changes will be made to the alignment of the bridge.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Bruce Sylvia![]() |
| Estimated Total Contract Cost: | $3,701,860.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|