Project Description: |
LEICESTER- BRIDGE REPLACEMENT, BR# L-06-028, PARKER STREET OVER BARTONS BROOK
The purpose of this project is to demolish the existing bridge and wingwalls and construct a new bridge. The new bridge will consist of two parallel aluminum eliptical pipe arches, reinforced concete wingwalls on all four corners, and headwalls at both ends of the pipe arch.
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $558,662.00 |
Construction Bid Price: | $485,793.00 |
Initial Construction Estimate: | $377,265.00 |
District: | District 3 |
Current Status: | Working on punch list items. (as of 06/14/2006) |
|