| Project Description: |
FRAMINGHAM- BRIDGE BETTERMENT, F-07-040, MAIN STREET OVER ROUTE 9
The work under this contract consists of jacking the superstructure to replace elastomeric bearings and installing bearing keeper plates; removing and patching repairing deteriorated areas of the diaphragms and concrete beams near the bearings; removing and patching repairing deteriorated areas of the concrete pier and abutments; repairing concrete cracks at the pier, abutments and diaphragms.
|
| Location: |
|
| Resident Engineer: | Scott Kallin![]() |
| Construction Contract Value: | $736,403.60 |
| Construction Bid Price: | $610,275.00 |
| Initial Construction Estimate: | $662,605.50 |
| District: | District 3 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||