Project Description: |
FRAMINGHAM- BRIDGE REHABILITATION, BR# F-07-028 ROUTE 126 (CONCORD STREET) OVER ROUTE 9
Work under this contract consists of replacing the bridge structure, patching the abutments, resurfacing the approaches and replacement of approach sidewalks. All the work will be done maintaining at least two lanes over the structure.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | John Gendall |
Estimated Total Federal Participating Construction Cost: | $1,200,000.00 |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 08/23/2003 ) |
|
Bridges
|
|
|
|