Project Description:
UXBRIDGE- BRIDGE REHABILITATION, BR# U-02-009, ROUTE 16 (MENDON STREET) OVER THE MUMFORD RIVER
Work under this contract consists of replacing the bridge sidewalk and railing with a structural sidewalk, concrete rail with ornamental pedestrian handrails.
Location:
  • Town of Uxbridge
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: John Gendall
    Estimated Total Contract Cost: $438,710.19
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project