Project Description: |
NORWOOD- BRIDGE REPLACEMENT, N-25-003, MORSE STREET OVER THE NEPONSET RIVER
The existing Morse Street over the Neponset River bridge will be replaced with a single span prestressed concrete deck beam structure on new stub abutments. A temporary bridge will carry traffic during construction.
|
Location: |
|
Resident Engineer: | Thomas Kewriga |
Construction Contract Value: | $1,141,354.00 |
Construction Bid Price: | $988,134.00 |
Initial Construction Estimate: | $1,284,051.00 |
Total Estimated Project Cost: | $600,000.00 |
District: | District 5 |
|