| Project Description: |
FITCHBURG- LEOMINSTER- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 2
This project consists of resurfacing and related work (drainage cleaning, guardrail replacement, sign replacement, drainage system cleaning and repairs, tree and brush removal along shoulders) on Route 2 from approximately Mt. Elam Road westerly 1.9 miles to the vicinity of the Route 31 interchange. Construction of a deceleration lane at Palmer Road (eastbound) is included.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $2,034,600.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|