| Project Description: |
ATHOL- CONSTRUCTION OF A CHEMICAL STORAGE BUILDING AND RELATED WORK AT THE MAINTENANCE DEPOT ON ROUTE 32
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Gerald Donnellan![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project has been advertised for construction bids. (as of 03/02/2002 ) |
|