| Project Description: |
WAREHAM- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 25
The work included in this 3 mile resurfacing project includes minor drainage improvements and guardrail upgrades as needed.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $2,235,250.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||