Project Description:
EASTHAMPTON- BRIDGE REPLACEMENT, E-05-024, ROUTE I-91 NB & SB OVER EAST STREET
Two new 3-span bridges on new supports will replace the existing structurally deficient structures at its present location. Each new bridge will maintain the present roadway width of two-12 foot lanes, a 10 foot right shoulder, and a 4 foot left shoulder.
Location:
  • Town of Easthampton
  • Resident Engineer: Steven Zych
    Construction Contract Value: $13,322,606.57
    Construction Bid Price: $11,357,770.50
    Initial Construction Estimate: $8,017,827.50
    District: District 2

    Contracts (2) Progress
    # 49428 -- Construction Contract
    Easthampton - Bridge Replacement (E-05-024) - I-90 over East Street Completed
    # 54827 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final

    Bridges

    Contract Dates
    Notice to Proceed: 01/11/2007
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 05/17/2001
    Project Review Committee PRC Approved 06/26/2001
    Project Status Advertised 07/30/2005
    Project Management
    100% Design 100% Package Received 01/11/2005
    100% Design 100% Package Comments to DE 05/25/2005
    25% Design 25% Package Received 11/04/2002
    25% Design 25% Package Comments to DE 01/24/2003
    75% Design 75% Package Received 12/31/2003
    75% Design 75% Package Comments to DE 10/13/2004
    Final Design PS&E Received 07/15/2005
    Final Design PS&E to FAPRO 07/26/2005