Project Description: |
EASTHAMPTON- BRIDGE REPLACEMENT, E-05-024, ROUTE I-91 NB & SB OVER EAST STREET
Two new 3-span bridges on new supports will replace the existing structurally deficient structures at its present location. Each new bridge will maintain the present roadway width of two-12 foot lanes, a 10 foot right shoulder, and a 4 foot left shoulder.
|
Location: |
|
Resident Engineer: | Steven Zych |
Construction Contract Value: | $13,322,606.57 |
Construction Bid Price: | $11,357,770.50 |
Initial Construction Estimate: | $8,017,827.50 |
District: | District 2 |
|
Bridges
|
|
|
|
|