| Project Description: |
DISTRICT 4- BRIDGE CLEANING AND DRAINAGE SYSTEMS MAINTENANCE (NORFOLK & SUFFOLK COUNTIES) (2 SEPARATE CONTRACTS)
This work consists of cleaning and flushing scuppers, gutters, troughs, downspouts, drain inlets and catch basins.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $400,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 12/15/2001 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||