Project Description:
CLINTON- BRIDGE REPLACEMENT, C-16-003, ROUTE 62 & 70 (BOYLSTON STREET & CHESTNUT STREET) OVER THE NASHUA RIVER
The work under this project consists of the replacement of the Boylston-Chestnut Street bridge (Route 62 & 70) over the Nashua River. The proposed structure will be a two-span bridge similar in width and span lengths to the existing bridge. A 42.5 foot wide bituminous concrete wearing surface and reinforced concrete deck will be supported by steel girders. A new center pier and abutments will be constructed. Stage construction will be used, maintaining one lane of traffic in each direction. The new bridge will be widened approximately 2.7 feet along the west side to facilitate two-lane traffic during construction. A new 6 foot handicap accessible sidewalk will be constructed on both sides of the bridge.
Location:
  • Town of Clinton
  • Resident Engineer: Hassan Valipour
    Construction Contract Value: $6,033,484.37
    Construction Bid Price: $4,758,919.00
    Initial Construction Estimate: $4,097,471.00
    District: District 3

    Contracts (3) Progress
    # 32181 -- Design -- Footprint Bridge contracts
    Statewide - Footprint Bridge Round 3 - Contract N Final
    # 44341 -- Construction Contract
    Clinton - Bridge Repplacement (C-16-003) Rte 62&70 over the Nashua River Completed
    # 57732 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects, includes ABP projects Final

    Bridges

    Contract Dates
    Notice to Proceed: 06/15/2006
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 06/04/2001
    Project Review Committee PRC Approved 06/26/2001
    Project Review Committee Letter 10/29/2001
    Project Status Advertised 09/17/2005
    Project Status Advertised 12/17/2005
    Project Management
    100% Design 100% Package Received 06/16/2005
    100% Design 100% Package Comments to DE 07/08/2005
    25% Design 25% Package Received 10/28/2002
    25% Design 25% Package Comments to DE 05/12/2003
    25% Design Design Public Hearing 10/08/2003
    75% Design 75% Package Received 04/22/2004
    75% Design 75% Package Comments to DE 11/05/2004
    Final Design PS&E Received 08/03/2005
    Final Design PS&E to FAPRO 08/03/2005
    Consultant Contract Process NTP Issued 03/05/2000