Project Description: |
LITTLETON- BRIDGE REPLACEMENT, BR# L-13-016, TAYLOR STREET OVER ROUTE 2
The existing bridge will be replaced with a new two span bridge. The bridge will be constructed in multiple stages in order to maintain two lanes of traffic plus pedestrian access. All construction activities will be done within the State Layout Line.
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $4,280,101.00 |
Construction Bid Price: | $3,792,274.00 |
Initial Construction Estimate: | $4,007,954.00 |
Total Estimated Project Cost: | $4,000,000.00 |
District: | District 3 |
Current Status: | Project is complete except for minor punch list items. All lanes are open. (as of 10/04/2006) |
|