| Project Description: |
LITTLETON- BRIDGE REPLACEMENT, BR# L-13-016, TAYLOR STREET OVER ROUTE 2
The existing bridge will be replaced with a new two span bridge. The bridge will be constructed in multiple stages in order to maintain two lanes of traffic plus pedestrian access. All construction activities will be done within the State Layout Line.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Gautam Sen![]() |
| Estimated Total Contract Cost: | $4,280,101.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Total Estimated Project Cost: | $4,000,000.00 |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 07/10/2004 ) |
|