Project Description:
HOLDEN- BRIDGE REHABILITATION, H-18-022, PRINCETON STREET OVER QUINAPOXET RESERVOIR
MassHighway is proposing to rehabilitate the town-owned Princeton Street Bridge, which crosses over an outlet from the Quinapoxet Reservoir to the Quinapoxet River. The existing bridge's concrete abutments and corrugated iron arch will be repaired, and a protective coating will be applied to the exposed surface of the arch. A new concrete slab bridge deck will be constructed and will include a decorative bridge rail. New façade elements of the bridge and rail will be faced with stone to match the existing stone facing of the bridge.
Location:
  • Town of Holden
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Shawn Holland
    Estimated Total Contract Cost: $725,772.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project