| Project Description: |
MARLBOROUGH- BRIDGE REPLACEMENTS, M-06-003, ROBIN HILL STREET OVER ASSABET RIVER & M-06-004, BOUNDARY STREET OVER ASSABET RIVER
This project will result in the replacement of the Robin Hill Road and Boundary Street bridges with single span concrete bridges. The proposed curb-to-curb width on both bridges is 26 feet. Also proposed is the installation of 5 foot wide sidewalks on both bridges and roadway approach work consisting of full depth roadway reconstruction.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Michael Papadopoulos![]() |
| Estimated Total Contract Cost: | $2,941,408.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|