Project Description:
WORCESTER- BRIDGE REPLACEMENT, W-44-063, ROUTE 122 (GRAFTON STREET) OVER ROUTE 20
The proposed project includes the bridge replacement of the existing two-span bridge located on State Route 122 (Grafton Street) over U.S. Route 20 with a single span steel bridge. The existing 60' wide structure is proposed to be replaced with an 86.5 foot wide cross section containing 4 travel lanes, a turning lane, 2 six foot bike lanes and 2 six foot sidewalks. The interchange ramps and approaches are proposed to be reconfigured and replaced.
Location:
  • City of Worcester
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Jacob Tanoglu
    Estimated Total Contract Cost: $24,764,600.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: 75% Package Received (as of 02/01/2005 )

    Contracts (2) Progress
    # 57734 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 77885 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 09/24/2001
    Project Review Committee PRC Approved 10/31/2001
    Project Review Committee Letter 11/29/2001
    Project Management
    25% Design 25% Package Received 03/13/2003
    25% Design 25% Package Comments to DE 11/13/2003
    25% Design Design Public Hearing 02/23/2004
    75% Design 75% Package Received 02/01/2005
    75% Design 75% Package Received 02/01/2005
    Consultant Contract Process Scope to DE 11/01/2004