Project Description: |
NORTH ADAMS- DEMOLITION OF BRIDGE, BR# N-14-002, GALVIN ROAD OVER THE HOOSIC RIVER (BLACKINGTON BRIDGE)
This project consists of the demolition and removal of the existing bridge superstructure over the Hoosic River. A replacement bridge at this location has not yet been approved.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Municipality |
Project Manager: | Albert Li |
Estimated Total Federal Participating Construction Cost: | $150,000.00 |
District: | District 1 |
Current Status: | This project has been advertised for construction bids. (as of 02/21/2004 ) |
|