| Project Description: |
BARRE- BRIDGE REPLACEMENT, B-02-012, VERNON AVENUE OVER THE WARE RIVER
The work includes replacing the existing Vernon Avenue bridge (7.4 meters) over the Ware River with a wider bridge (10 meters). The bridge will be closed and a detour will be provided during construction.
|
| Location: |
|
| Resident Engineer: | Stefan Toth![]() |
| Construction Contract Value: | $3,667,929.00 |
| Construction Bid Price: | $3,171,754.00 |
| Initial Construction Estimate: | $3,897,512.79 |
| District: | District 2 |
|