Project Description: |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA A (2 SEPARATE CONTRACTS)
The work to be done under this contract consists of the installation of drainage pipes and structures, rebuilding of drainage structures, cleaning of waterways, drainage ditches, drainage structures and pipes in Area 5A.
|
Location: | |
Resident Engineer: | Stephen Soares |
Construction Contract Value: | $949,800.00 |
Construction Bid Price: | $797,400.00 |
Initial Construction Estimate: | $647,500.00 |
District: | District 5 |
|