Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
WARE- BRIDGE REPLACEMENT, BR# W-05-011, HARDWICK POND ROAD OVER MUDDY BROOK
The Hardwick Pond Road bridge will be replaced with a single span concrete bridge. The new bridge will be constructed in phases, to ensure continuity of farming operations and vehicular traffic. The proposed replacement bridge will be built along the existing alignment with a roadway width of 26 feet. A 5 foot wide sidewalk will be located on the south side of the bridge.
Location:
  • Town of Ware
  • Resident Engineer: Daryl Amaral
    Construction Contract Value: $1,073,361.00
    Construction Bid Price: $965,929.00
    Initial Construction Estimate: $1,070,035.11
    District: District 2
    Current Status: Bridge under construction (as of 01/29/2007)
    Additional Info: Bridge open to two lanes (as of 05/10/2007)

    Contracts (1) Progress
    # 39651 -- Construction Contract
    WARE - Bridge Replacement - (W-05-011) - Hardwick Pond Road over Muddy Brook Completed

    Bridges

    Contract Dates
    Notice to Proceed: 06/03/2005
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Bridge under construction
    Additional Info
    Bridge open to two lanes
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 12/05/2001
    Project Review Committee PRC Approved 05/06/2002
    Project Review Committee Letter 05/20/2002
    Project Status Advertised 09/25/2004
    Project Management
    100% Design 100% Package Received 08/16/2004
    25% Design 25% Package Received 05/27/2003
    25% Design 25% Package Comments to DE 10/28/2003
    75% Design 75% Package Received 10/22/2003
    75% Design 75% Package Comments to DE 01/29/2004
    Final Design PS&E Received 09/21/2004
    Final Design PS&E to FAPRO 09/21/2004