Project Description:
TAUNTON- BRIDGE REPLACEMENT, T-01-021, BAY STREET OVER THE MILL RIVER & REPLACEMENT OF DAM MA00923
The proposed project consists of replacing the existing bridge carrying Bay Street over the Mill River in its present location. The dam locally known as "Morey's Dam" will be reconstructed adjacent to the bridge. A fish ladder will be installed in the dam structure. Minor improvements will be made to the approach roadways in both directions. The bridge will be closed to vehicular traffic during construction with a detour in place.
Location:
  • City of Taunton
  • Project Manager: Manhar Patel
    Estimated Total Contract Cost: $5,063,529.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • T01021 
    See the Milestone Details tab for additional Project information