Project Description:
TAUNTON- BRIDGE REPLACEMENT, T-01-021, BAY STREET OVER THE MILL RIVER & REPLACEMENT OF DAM MA00923
The proposed project consists of replacing the existing bridge carrying Bay Street over the Mill River in its present location. The dam locally known as "Morey's Dam" will be reconstructed adjacent to the bridge. A fish ladder will be installed in the dam structure. Minor improvements will be made to the approach roadways in both directions. The bridge will be closed to vehicular traffic during construction with a detour in place.
Location:
  • City of Taunton
  • Resident Engineer: Eric Borman
    Construction Contract Value: $5,063,529.00
    Construction Bid Price: $4,308,286.47
    Initial Construction Estimate: $4,837,638.00
    District: District 5

    Contracts (5) Progress
    # 30271 -- Design -- Footprint Bridge contracts
    Statewide Footprint Bridge Round 1 Final
    # 57462 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 59043 -- Design -- Bridge Open End
    Work will consist of statewide bridge design for the Accelerated Bridge Program on an open end basis. Final
    # 68385 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 71225 -- Construction Contract
    Bridge and Dam Replacement (T-01-021) (Steel) - Bay Street over the Mill River and Dam (MA 00923) (Concrete). (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 01/26/2012
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 12/05/2001
    Project Review Committee PRC Approved 05/06/2002
    Project Review Committee Letter 05/21/2002
    Project Status Advertised 09/24/2011
    Project Management
    25% Design 25% Package Received 07/23/2010
    25% Design 25% Package Comments to DE 10/07/2010
    25% Design Design Public Hearing 09/23/2010
    75% Design 75% Package Received 05/19/2011
    75% Design 75% Package Comments to DE 07/21/2011
    Final Design PS&E Received 09/02/2011
    Final Design PS&E to FAPRO 09/19/2011
    Consultant Contract Process Scope to DE 08/21/2009
    Consultant Contract Process NTP Issued 01/05/2010