Project Description: |
AMHERST- BRIDGE REPLACEMENT, BR# A-08-013, MEADOW STREET OVER SWAMP BROOK (EASTMAN BROOK)
The proposed project consists of the replacement of the Meadow Street Bridge over the Swamp Brook on the existing alignment with improvements to the approach roadway.
|
Location: |
|
Resident Engineer: | Joseph Gaudet Jr |
Construction Contract Value: | $1,084,228.00 |
Construction Bid Price: | $976,162.00 |
Initial Construction Estimate: | $810,358.00 |
District: | District 2 |
Current Status: | Physical work complete (as of 06/11/2006) |
Additional Info: | Bridge open to traffic (as of 05/10/2007) |
|