Project Description: |
ASHLAND- BRIDGE REPLACEMENT, A-14-002, ROUTE 135 (UNION STREET) OVER THE SUDBURY RIVER
The proposed project consists of replacing the existing Union Street (Route 135) bridge over the Sudbury River in its present location with minor improvements to the approach roadways. The bridge will be remain open during construction utilizing staged construction.
|
Location: |
|
Resident Engineer: | Michael Sholock |
Construction Contract Value: | $2,284,285.00 |
Construction Bid Price: | $1,957,895.62 |
Initial Construction Estimate: | $2,439,232.00 |
District: | District 3 |
|