| Project Description: |
DISTRICT 4- (ESSEX & MIDDLESEX COUNTIES) SCHEDULED AND EMERGENCY DECK REPAIRS (2 SEPARATE CONTRACTS)
This work consists of partial and/or full depth excavation of the existing reinforced cement concrete decks, sidewalks and approach slab. The concrete decks will be replaced with fast setting concrete.
|
| Location: | |
| Resident Engineer: | Robert Huettner![]() |
| Construction Contract Value: | $4,405,890.00 |
| Construction Bid Price: | $1,143,890.00 |
| Initial Construction Estimate: | $1,579,070.00 |
| District: | District 4 |
| Current Status: | Deck repairs were completed at the following dates at the corresponding locations. 9/30/07 and 10/1/2007- Lynnfield Rte 1 @ Rte 128. 10/2/2007- Lawrence- Rte 28 @ South Canal 10/2/2007,10/3/2007 and 10/4/2007- Lynnfield -Rte 1 @ Rte 128 Lawrence-- Rte 495 @ RR/Merrimack RV. 10/7/2007- Haverhill- Bassilirre -Rte 125 @ Merrimac. 10/8/2007- Lawrence- Rte 495 @ R.R./Merrimac River. 10/8/2007- Haverhill - Rte 125 connector @ Rte 495 10/10/2007- Lynnfield- Rte 1 @ Rte 128 10/10/2007- Gloucester- Centen. Ave. @ R.R. (as of 10/22/2007) |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||