| Project Description: |
DISTRICT 4- (NORFOLK & SUFFOLK COUNTIES) SCHEDULED AND EMERGENCY DECK REPAIRS (2 SEPARATE CONTRACTS)
This work consists of partial and/or full depth excavation of the existing reinforced cement concrete decks, sidewalks and approach slab. The concrete decks will be replaced with fast setting concrete.
|
| Location: | |
| Resident Engineer: | John Plasteras Jr![]() |
| Construction Contract Value: | $3,505,890.00 |
| Construction Bid Price: | $1,143,890.00 |
| Initial Construction Estimate: | $1,579,070.00 |
| District: | District 4 |
| Current Status: | Work under this contract consists of partial and/or full depth excavation of the existing reinforced concrete decks, sidewalks and approach slabs where deterioration has occurred and the replacement of the excavated concrete with a fast-setting concrete. (as of 02/11/2008) |
| Additional Info: | 1/21/08 and 1/22/08 - Danvers -Rte 1 @ Centre St. 1/23/08- Somerville- Rte 93 @Rte 28 ramp. (as of 02/11/2008) |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||