Project Description: |
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS (5 SEPARATE CONTRACTS)
The purpose of this project is to ensure motorist safety and guidance along the State Highway System by providing new warning, regulatory, and guide signs. This is a sign maintenance project to replace signs that are worn and non-reflective and no longer meet present standards.
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Bhupendra Naik |
Estimated Total Federal Participating Construction Cost: | $600,000.00 |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 03/30/2002 ) |
|