| Project Description: |
DISTRICT 3- SCHEDULED AND EMERGENCY BRIDGE SUBSTRUCTURE REPAIRS
The work to be done includes the removal of deteriorated concrete from the bridge and its replacement with new materials. Repairs will also be performed on the bridge bearings and the slopes under the bridge.
|
| Location: | |
| Resident Engineer: | James Robida![]() |
| Construction Contract Value: | $1,035,150.00 |
| Construction Bid Price: | $926,150.00 |
| Initial Construction Estimate: | $1,104,000.00 |
| District: | District 3 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||