DISTRICT 4- SOLID WASTE REMOVAL AT VARIOUS MHD FACILITIES (5 SEPARATE CONTRACTS)
This project consists of the removal of accumulated solid waste from District facilities. The removal is conducted as requested by Area Supervisors and/or facility foremen. All work is conducted within MassHighway facility property. The solid waste stockpiled at facilities results from regular district activities including street sweeping, roadside debris pickup, tree trimming and other minor roadside maintenance activities. Solid waste items used are: Asphalt, Brick, and Concrete, Construction and Demolition Debris, Bulky waste Wood Waste, Street Sweepings, Treated Wood, Catch Basin Cleanings, Unclassified Excavation.
Location:
Resident Engineer: Kenneth Leach
Construction Contract Value: $861,780.40
Construction Bid Price: $861,780.40
Initial Construction Estimate: $991,000.00
District: District 4
Current Status: Removal of Solid waste from District Four facilities is conducted as requested by area supervisors and/or facility foreman. All work is conducted within Mass Highway facility property. All solid waste stockpiled at facilities results from regular District activities , including street sweeping, roadside debris pick-up, tree trimming and other roadside maintenance activities. Solid waste items used and the current quantities used as of Estimate #55 Dated 12/29/06 are; Asphalt, brick and concrete-2,2,681.15 megagrams(mg), construction and demolition debris- 1,081.26 Bulky waste-149.59 MG, Wood Waste- 1,572.84 MG,, Street Sweepings- 14,878.26 mg, Treated Wood- 26.69mg, Catch Basin Cleanings-508.69mg, Unclassified Excavation- 128.52 Cubic Meters. The current completion date was 12/30/2006. (as of 05/03/2007)

Contracts (1) Progress
# 33148 -- Construction Contract
Solid Waste Removal at Various MHD Facilities. (5 Separate Contracts) Completed

Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/31/2002
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 03/13/2002
    Project Review Committee PRC Approved 05/06/2002
    Project Review Committee Letter 05/14/2002
    Project Status Advertised 08/17/2002
    Project Management