| Project Description: |
PRINCETON- BRIDGE REPLACEMENT, P-16-003, BALL HILL ROAD OVER WACHUSETT BROOK
The proposed project includes the demolition of the existing Ball Hill Road bridge and the construction of a new single span bridge. The new bridge will be built on the existing alignment. The proposed typical section for the new bridge will consist of two travel lanes with shoulders
|
| Location: |
|
| Resident Engineer: | Hassan Valipour![]() |
| Construction Contract Value: | $923,639.81 |
| Construction Bid Price: | $802,296.20 |
| Initial Construction Estimate: | $771,265.00 |
| District: | District 3 |
|