Project Description: |
PRINCETON- BRIDGE REPLACEMENT, P-16-003, BALL HILL ROAD OVER WACHUSETT BROOK
The proposed project includes the demolition of the existing Ball Hill Road bridge and the construction of a new single span bridge. The new bridge will be built on the existing alignment. The proposed typical section for the new bridge will consist of two travel lanes with shoulders
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Michael-kosmas Bloukos |
Estimated Total Contract Cost: | $923,639.81 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|