TOWNSEND- BRIDGE REPLACEMENT, T-07-008, WHEELER ROAD OVER WILLARD BROOK
This project consists of replacing the current bridge with a new steel bridge to be built on the same alignment as the existing bridge. The proposed bridge will have a curb to curb dimension of 29.5 feet. A 5 foot sidewalk will be located on the north side of the bridge. During construction, the bridge will be closed and vehicular traffic will be detoured. A temporary sidewalk will be constructed to allow pedestrians to cross Willard Brook.
|