| Project Description: |
LANESBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 7
The project begins at the Pittsfield/Lanesborough line and proceeds northerly to Mile Marker 36.95. It includes resurfacing the roadway and reconstructing some areas where the foundation has failed, removing and resetting granite curbing and improving drainage. Existing guard rail will be retained and existing buried ends will be replaced with end treatments suitable for high speed application.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $3,657,653.06 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||