| Project Description: |
DALTON- PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ORCHARD STREET
PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ORCHARD STREET
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Bassam Salfity![]() |
| Estimated Total Contract Cost: | $625,197.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|