ADAMS- INTERSECTION IMPROVEMENTS INCLUDING SIGNAL RECONSTRUCTION, ROUTE 8 (COMMERCIAL STREET) AT ROUTE 116 (CENTER STREET)
As a result of the Major Investment Study for Access to Central and North Berkshire, MassHighway identified this intersection as a project to reduce travel time to North Berkshire County. The existing signal system will be replaced with a fully actuated signal system sensitive to traffic demand to improve the flow of traffic. Also included will be an update to pedestrian access at the intersection along with dedicated turn lanes.
Location:
  • Town of Adams
  • Resident Engineer: Amer Raza
    Construction Contract Value: $368,473.00
    Construction Bid Price: $306,975.80
    Initial Construction Estimate: $283,887.50
    District: District 1
    Current Status: Project is complete. (as of 12/05/2006)

    Contracts (1) Progress
    # 43491 -- Construction Contract
    Route 8 and Route 116 Signal Upgrades Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/24/2006
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Project is complete.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/23/2002
    Project Review Committee PRC Approved 05/06/2002
    Project Review Committee Letter 11/01/2002
    Project Status Advertised 09/03/2005
    Project Management
    75% Design 75% Package Received 05/03/2005
    75% Design 75% Package Comments to DE 06/16/2005
    Final Design PS&E Received 08/31/2005
    Final Design PS&E to FAPRO 08/31/2005