| Project Description: |
GREAT BARRINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 7 & 23
This project will resurface Route 20 from the Belcher Square intersection to the Housatonic River Bridge. Sidewalks on both sides of the road will be replaced and upgraded to current ADA standards. Minor drainage improvements will be included along with new granite curb, cold planning and resurfacing.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $1,161,578.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||