Project Description:
GREAT BARRINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 7 & 23
This project will resurface Route 20 from the Belcher Square intersection to the Housatonic River Bridge. Sidewalks on both sides of the road will be replaced and upgraded to current ADA standards. Minor drainage improvements will be included along with new granite curb, cold planning and resurfacing.
Location:
  • Town of Great Barrington
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Li
    Estimated Total Contract Cost: $1,161,578.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project