Project Description:
BOURNE- WAREHAM- BRIDGE REPLACEMENT, B-17-017=W-06-012, US ROUTE 6 & STATE ROUTE 28 (CRANBERRY HIGHWAY) OVER COHASSET NARROWS
The work for this project consists of the demolition and replacement of the William H. Dalton Memorial Bridge carrying US Route 6/State Route 28 (the Cranberry Highway) over Cohasset Narrows at the Bourne-Wareham Town Line. The proposed project will replace the existing structure with a new 350 foot long 3-span bridge. The new bridge deck will be 70-feet 9-inches wide accommodating a 56-foot roadway and two 6-foot wide sidewalks protected with bridge railing. It is estimated that approximately 300 feet of roadway approach work will be required at the Bourne and Wareham sides of the bridge. The construction of the bridge will be accomplished in 5 stages allowing two lanes of through traffic to be maintained during construction.
Location:
  • Town of Bourne
  • Town of Wareham
  • Resident Engineer: Richard McKenzie
    Construction Contract Value: $13,832,920.30
    Construction Bid Price: $11,587,946.00
    Initial Construction Estimate: $13,181,580.99
    District: District 5

    Contracts (8) Progress
    # 32285 -- Design -- Bridge Rehab/Recon/New Const
    Bourne - Design for reconstructing Bridge #B-17-017 carrying US Route 6 Marion Road over Cohasset Narrows. Final
    # 51303 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 54837 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 57467 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 57725 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 64300 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68382 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 70562 -- Construction Contract
    Bridge Replacement (B-17-017=W-06-012) (Concrete) - US Routes 6 and 8 (Cranberry Highway) over Cohasset Narrows. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/13/2012
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 05/06/2002
    Project Review Committee PRC Approved 11/04/2002
    Project Review Committee Letter 11/14/2002
    Project Status Advertised 08/13/2011
    Project Management
    25% Design 25% Package Received 05/20/2009
    25% Design 25% Package Comments to DE 01/07/2009
    25% Design 25% Package Comments to DE 01/07/2009
    25% Design 25% Package Comments to DE 11/09/2009
    25% Design 25% Package Approved 05/28/2009
    25% Design Design Public Hearing 08/12/2009
    75% Design 75% Package Received 11/10/2009
    Final Design PS&E Received 06/08/2010
    Final Design PS&E Received 03/11/2011
    Final Design PS&E Received 07/25/2011
    Final Design PS&E to FAPRO 08/09/2011
    Consultant Contract Process Scope to DE 08/07/2002
    Consultant Contract Process NTP Issued 07/29/2003