PEPPERELL- BRIDGE REPLACEMENT, P-06-003, MILL STREET OVER THE NISSITISSIT RIVER
This project consists of replacing the Mill Street Bridge over the Nissitissit River in its present location in Pepperell. The new bridge will have precast concrete box beams on integral abutments founded on steel piles. The new abutments will be installed behind the existing abutments. The bridge will be closed to vehicular traffic and a detour signed during construction. The restoration of bridge/street lighting is also part of the project.
Location:
  • Town of Pepperell
  • Resident Engineer: Frederick Stacy
    Construction Contract Value: $1,619,503.00
    Construction Bid Price: $1,428,566.80
    Initial Construction Estimate: $1,962,867.00
    District: District 3

    Contracts (2) Progress
    # 43179 -- Design -- Hwy Eng Open End
    Layout Section requires a consultant to provide the service of Layout plan and written description preparation. Final
    # 65827 -- Construction Contract
    Bridge Replacement (P-06-003) (Concrete) – Mill Street over the Nissitissit River. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 11/08/2010
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 05/06/2002
    Project Review Committee PRC Approved 11/04/2002
    Project Status Advertised 07/10/2010
    Project Management
    25% Design 25% Package Received 10/18/2004
    25% Design 25% Package Received 12/17/2008
    25% Design 25% Package Comments to DE 12/15/2004
    25% Design Design Public Hearing 06/04/2009
    75% Design 75% Package Received 12/10/2009
    75% Design 75% Package Comments to DE 02/01/2010
    Final Design PS&E Received 03/23/2010
    Final Design PS&E Received 06/30/2010
    Final Design PS&E to FAPRO 07/06/2010
    Consultant Contract Process Scope to DE 04/11/2008
    Consultant Contract Process NTP Issued 09/17/2008