Project Description: |
NORTH ATTLEBOROUGH- BRIDGE REPLACEMENT, BR# N-16-008, HUNTS BRIDGE ROAD OVER ABBOTT RUN
A new bridge will be constructed downstream of the existing bridge. The existing bridge is of historic significance and will remain in service for pedestrian use only. Approximately 800 feet of roadway work will be required to connect the bridge to the existing roadway.
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $1,119,467.00 |
Construction Bid Price: | $999,789.00 |
Initial Construction Estimate: | $801,059.00 |
District: | District 5 |
|
Bridges
|
|
|
|
|