Project Description: |
CHELMSFORD- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-495
This project will result in a resurfaced I-495 from the Westford/Chelmsford town line to Exit 35 in Chelmsford. This project is 3.8 miles in length.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $4,479,297.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|