| Project Description: | CONWAY- BRIDGE REHABILITATION, BR# C-20-009, MAIN POLAND ROAD OVER THE SOUTH RIVER The purpose of this project is to repair and strengthen the existing historic timber covered bridge over the South River.  | 
| Location: |  | 
| Resident Engineer: | Paul Phelps  | 
| Construction Contract Value: | $1,234,234.00 | 
| Construction Bid Price: | $1,092,940.00 | 
| Initial Construction Estimate: | $603,070.00 | 
| District: | District 1 | 
| 
 | Bridges
 | ||||||||||||||
| 
 | ||||||||||
| 
 | 
| 
 | 
| 
 
 
 | |||||||||||