| Project Description: |
CONWAY- BRIDGE REHABILITATION, BR# C-20-009, MAIN POLAND ROAD OVER THE SOUTH RIVER
The purpose of this project is to repair and strengthen the existing historic timber covered bridge over the South River.
|
| Location: |
|
| Resident Engineer: | Paul Phelps![]() |
| Construction Contract Value: | $1,234,234.00 |
| Construction Bid Price: | $1,092,940.00 |
| Initial Construction Estimate: | $603,070.00 |
| District: | District 1 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||