| Project Description: |
FALL RIVER- BRIDGE REPLACEMENT, BR# F-02-093, CENTRAL STREET OVER QUEQUECHAN RIVER
The work to be done under this contract involves the repair of an existing stone masonry bridge with an "Archtec System". This is a proprietary system designed & installed by Cintec America, Inc.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Gautam Sen![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project has been advertised for construction bids. (as of 09/27/2003 ) |
|
Bridges
|
||||||||
|
|
|
|||||||||||||||||||||||