| Project Description: |
DISTRICT 4- GUARDRAIL REFURBISHMENT AT VARIOUS LOCATIONS
This work consists of furnishing labor, equipment and the materials necessary to refurbish or repair safety barrier (steel beam guardrail) on State Highways.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $750,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 06/28/2003 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||