BUCKLAND- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2
CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2
Location:
  • Town of Buckland
  • Project Manager: Bassam Salfity
    Estimated Total Contract Cost: $737,510.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information