| Project Description: |
BUCKLAND- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2
CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2
|
| Location: |
|
| Project Manager: | Bassam Salfity![]() |
| Estimated Total Contract Cost: | $737,510.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||