| Project Description: |
DISTRICT 3- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS
The work included under this contract consists of scheduled and emergency deck repairs on bridges within District 3. The work will include partial or full depth excavation of deteriorated reinforced concrete bridge decks and replacement with a fast-setting concrete patching compound.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $800,000.00 |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 03/22/2003 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||