| Project Description:
|
DISTRICT 3- DISTRICT WIDE MILLING AND RESURFACING (SUTTON SIDEWALKS)
The work consists primarily of a minor resurfacing (unless otherwise noted) on segments of the following roadways within the MassHighway District 3 Region: Blackstone Route 122, 1.0 mile; Littleton Route 2A/110, 2.1 miles; Oxford - Route 20, 1.6 miles; Sudbury Route 20, 0.3 miles; Wayland Route 20, 1.4 miles; Westford Route 110, 1.9 miles; Worcester Route 20, 0.4 miles; Sutton Sidewalks, 4000 feet.
|