| Project Description: |
WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION (CENTER DOWNTOWN SECTION)
This section of the multi-phase of the Columbia Greenway Rail Trail project is from Main Street north to the Westfield River bridge (W-25-036). The project includes the replacement of 4 bridges (W-25,014, W-25-015, W-25-016, W-25-017) and construction of a new bridge over Main Street.
|
| Location: |
|
| Construction Begins: | Autumn 2019 |
| Resident Engineer: | Thomas Doody![]() |
| Construction Bid Price: | $7,677,136.00 |
| District: | District 2 |
|