WESTFIELD- COLUMBIA GREENWAY RAIL TRAIL CONSTRUCTION (CENTER DOWNTOWN SECTION)
This section of the multi-phase of the Columbia Greenway Rail Trail project is from Main Street north to the Westfield River bridge (W-25-036). The project includes the replacement of 4 bridges (W-25,014, W-25-015, W-25-016, W-25-017) and construction of a new bridge over Main Street.
|
Location: |
|
Construction Begins: | Autumn 2019 |
Resident Engineer: | Thomas Doody |
Construction Bid Price: | $7,677,136.00 |
District: | District 2 |
|
Bridges
|
|
|
|
|